Electric Power Generation
For almost three decades from the early part of 1970 to 1994, MIESCOR handled the engineering, construction and management, testing, and maintenance of several power plants responsible for producing a chunk of MERALCO's power source.

These include 150+200 MW Gardner thermal power plants, 2x250 MW Snyder thermal power plants, 300+350 MW Malaya thermal power plants and 100 MW Tegen thermal power plant. In 1980, MIESCOR was contracted by Westinghouse International Projects for the electro-mechanical works of the 620 MW Philippine Nuclear Power Plant No. 1.

MIESCOR also performed various engineering and construction works for other solid and liquid fuel as well as combined cycle power plants. Projects include the 215 MW Bauang Diesel power plant; 108 MW Subic Diesel power plant; 2x300 MW Masinloc Coal-fired power plant; erection of HSRG and turbine installation of the 4x250 MW Sta. Rita combined cycle gas turbine (CCGT) power plant; and turbine installation, electrical testing and commissioning works of the 2x250 MW San Lorenzo CCGT power plant.