TELECOMMS
Wireless Private Network
Project Scope
- Conduct a site survey and develop a design plan for the implementation of Wireless Private Network technology and equipment installation across base stations.
- Perform the installation of AAU, RRU, CPRI, BBU, DCDU units and their corresponding cabling across base stations.
- Carry out the installation of six servers within the Meralco Data Center, ensuring proper configuration, connectivity, and integration with existing infrastructure.
- Deploy 1,139 Customer Premises Equipment (CPE) units and verify end-to-end connectivity and integration across all base stations to support reliable network performance.
Project Gallery
Related Projects
500MW San Marcelino Solar Power Plant
Ilijan, Batangas
Santa Cruz Solar Energy Inc. (SCEI)
San Marcelino, Zambales
EPC OF 500kV TRANSMISSION LINE FACILITY CONNECTING EERI CCPP SUBSTATION TO ILIJAN SUBSTATION
San Marcelino, Zambales
28.6 MW Solar Power Plant Project
San Roque Digos , Davao City
54MW Pililla Wind Farm
Brgy Halayhayin, Pililla, Rizal
CONTACT US
We’d Love To Know More About Your Project